Wood cladding may raise some doubts, however, there is a certain laying technology in this way. The advice of experts will allow you to take into account all the important points in the installation process and carry out repairs in the room with high quality.

1. Can I tile on the wooden floor in the bathroom?

Most often, this issue worries those who make repairs in private houses and cottages. In such buildings, wood serves as the basis for cladding. Facing in this case is acceptable, but it is worth assessing the condition of the surface and performing certain work on the eve of installation.
Further actions depend on the preliminary inspection of the base:

  • If the surface is in good condition, in this case, minor processing is carried out and laying can begin;
  • In the presence of serious flaws, installation is unacceptable. First you need to repair the base by replacing the necessary parts.

Calculate the amount of material required for flooring the room, while taking into account the specific layout option (herringbone, offset, diagonal, rows, etc.).
When repairing with your own hands, it is advisable to choose the simplest installation method, for example, cladding in rows. With a diagonal layout direction, the tile consumption will increase significantly, since it will be necessary to trim.

2. Preparation of the base for facing

When thinking about how to lay tiles on a wooden floor, you should first treat the surface of the base. Check the surface carefully before tiling. The covering can be made of a board, or a laminate.
The floor structure consists of rough level boards, which are fixed on wooden logs.


Old paint can be removed using different methods:
. mechanical way.
The meaning of this method is to use a grinder, or an electric drill with a nozzle in the form of sandpaper. Grit No. 40 is suitable for primary processing, No. 100 or No. 80 is recommended to complete grinding. The main advantage of mechanical action is the possibility of cleaning large enough areas.

. Thermal way.
For processing, you will need a high-power hair dryer that can warm the air up to + 300 .. + 600 degrees. Keep the device at a distance of 250-500 mm from the floor, after heating, the paint is removed in small parts, using a scraper or a metal spatula during operation.


Experts advise purchasing an industrial hair dryer with a special scraper, so you can combine the process of heating and cleaning wood from paint.


. Method of chemical influence.
Various solvents are suitable for this method. The paint is impregnated with a chemical composition, applying it with a spatula or brush, depending on the consistency of the substance. The saturation time is 10-30 minutes, after which the paint layer softens and can be easily removed.

Organizing the draft floor, logs are installed on top of the ceilings. Then parchment (waterproofing) is laid, the construction is completed with sheets of chipboard, plasterboard or plywood. Keep track of the evenness of the coating, the logs must be mounted according to the level.


Before laying the material, sheets of chipboard, plywood or GKLV must be treated with drying oil of warm temperature, or with another composition with protective properties. The device can be started immediately after the impregnation has dried.

Preparation of finishing material

Immersion in water will help to force the air out of the tile, 10-20 minutes is enough. If spots appear on the outside of the tile, then a slight wetting of the surface from the inside is sufficient.

3. Do I need a screed?

Before laying, you should check the coating and assess how even it is using a level. If there are significant deviations, it is necessary to make a screed before facing.

What alignment methods are there?

  • Wet screed . Suitable for those cases when it is necessary to increase the strength characteristics of the floor. At the same time, a gap is organized around the perimeter of the room, taking into account possible deformation. This condition allows the base to move without destroying the mounted coating;

  • Dry screed . This method is the most popular, because it allows you to create not only an even, but also a reliable floor with a high bearing capacity;
  • Leveling with GKLV sheets is considered the easiest option. . First of all, carefully examine the condition of the wood floor. Those bars that have rotted should be replaced with new elements. Next, drywall is installed, the sheets are fixed with polyurethane glue, the joints are treated with sealant. You should also impregnate the sheets with a primer mixture.

4. Laying tiles

The main steps for laying tiles on a wooden floor:

  • On the eve of the floor cladding, you need to determine the location of the parts. The center of a large wall is measured and a line is fixed on the floor, usually it is perpendicular. Similar actions are also carried out for a short wall.
  • The resulting lines at the point of intersection indicate the center of the room if the room is a rectangular shape. Organize the most interesting layout option, avoiding cutting tiles along the walls as much as possible.

    The floor around the bathroom is advised to be tiled symmetrically.

  • The composition of the glue is treated with 1 sq.m of the base in one of the corners measured by the center of the room. In order to conveniently distribute the glue, it is better to use a spatula or spatula.
  • Under the condition of a flat surface (differences in height no more than 3 mm), glue consumption is minimized. In this case, it is enough that the layer is less than 5 mm, because the adhesive composition only serves to adhere the floor and tiles. To level the surface, there is a special adhesive on sale that can eliminate protrusions (up to 30 mm). Also, the consumption of glue depends on the thickness of the tile.

    It is not necessary to knead the entire volume of glue at once, because the laying takes a long time. The composition should be gradually diluted, as needed.

  • You need to create pressure on the tile, then press it to the base. After that, you should continue laying, heading along the marked markings. Cover the entire area of ​​the floor treated with glue.
  • The layout is directed from the central point to the walls, while certain gaps between the tiles must be observed. After half of the floor surface in the bathroom is filled with tiles, the rest is also tiled. Next, you need to wait for the complete drying of the adhesive composition.

    The individual elements must be on the same level. If necessary, you can add a layer of glue.

  • We supplement the space between the wall and the laid material with undercuts. In order to accurately cut off some details of the finishing material, it is better to use a construction cutter.

Sometimes, when laying flooring, it is necessary to go around an object in the bathroom. In this case, use the exact contour by cutting it with a power saw.

  • After the glue becomes solid, the tiles are impregnated with a primer.

    There are collections of floor tiles in which the elements are coated with a primer. This information is specified on the packaging.

  • A scraper with a rubber tip is able to fill all the gaps between the elements with a solution. Excess solution can be removed with a dampened sponge, on the eve of drying;
  • If the bathtub is located close to a lined wall, the gap between the wall and the bathtub must be sealed to ensure tightness. A gap of less than 5 mm can be filled with a tiled fugue or moisture-resistant grout.